Preliminary solar design assurance and handover

Firstgreen assembles the evidence behind a preliminary PV layout so the next engineering team can reproduce quantities, locate assumptions and prioritise the work required for detailed design.

What is checked

We reconcile the block register against the overall drawing and equipment schedules, preserve the coordinate reference and record the status of land, terrain, equipment data and electrical routing. A successful placement check covers only the constraints represented in the model.

Handover deliverables

The issue includes a design basis, indexed block sheets, quantity schedules, an assumptions register and open actions. Each entry identifies the evidence required for closure, such as a survey, manufacturer drawing or confirmed cable route.