A narrow strip between two array fields may be more valuable to a solar layout than a larger parcel on its outer edge. The strip might complete several rows or provide the only practical access to an inverter station. Ranking land solely by hectares conceals these effects.
Test the parcel in the layout
Start with the land already available. Add one candidate parcel, keep the same table geometry and setbacks, and measure the change in complete tables. Repeat for adjoining parcels together. Their combined gain can differ from the sum of two isolated tests.
What to take to the land meeting
Show the map beside the incremental MWp, access implications and evidence for land status. Flag strips that appear usable in a map file but serve as roads. A capacity gain belongs in the conditional scenario until the team confirms availability.
Explore Firstgreen’s solar parcel and access feasibility service.

Leave a Reply