An overall layout answers how much capacity fits. A block sheet answers where it is connected. A useful review starts with one block and follows the arithmetic all the way to its station before repeating it across the site.
Work one row by hand
In the preliminary design example, a table with two rows of 56 modules carries 112 modules. At 28 modules per string, each complete table contributes four strings. At 610 Wp per module it represents 68.32 kWp. These figures let a reviewer reproduce the table-to-string conversion directly.
Check the aggregation
Compare the calculated strings with the allocations to the combiner boxes and inverters. Sum the block schedules by package before comparing them with the overall plan. Keep inverter MVA and export MW in separate columns so that an apparent agreement between unlike ratings cannot mask a discrepancy.