LEED CERTIFICATION- REQUIREMENTS FOR EA PREREQUISITE: BUILDING-LEVEL ENERGY METERING Required
Requirements
NC, SCHOOLS, RETAIL, WAREHOUSES & DISTRIBUTION CENTERS, HOSPITALITY, HEALTHCARE
- Install new or use existing building-level energy meters, or submeters that can be aggregated to provide building-level data representing total building energy consumption (electricity, natural gas, chilled water, steam, fuel oil, propane, biomass, etc).
- Utility-owned meters capable of aggregating building-level resource use are acceptable.
- At a minimum, energy consumption must be tracked at one-month intervals.
For Core and Shell
- Install new or use existing base building-level energy meters, or submeters that can be aggregated to provide base building-level data representing total building energy consumption (electricity, natural gas, chilled water, steam, fuel oil, propane, etc.).
- Utility-owned meters capable of aggregating base building- level resource use are acceptable.