3.6.6 CPSU SCHEME PHASE-II FOR SETTING UP 12,000 MW GRID-CONNECTED SOLAR PHOTOVOLTAIC (PV) POWER PROJECTS BY CPSUS/ STATE PSUS/ GOVERNMENT ORGANISATIONS, WITH VIABILITY GAP FUNDING (VGF) SUPPORT FOR SELF-USE OR USE BY GOVERNMENT/ GOVERNMENT ENTITIES, EITHER DIRECTLY OR THROUGH DISTRIBUTION COMPANIES (DISCOMS)
Government of India, through Ministry of New & Renewable Energy (MNRE), on 05.04.2019, has approved Implementation of CPSU Scheme Phase-II for setting up 12,000 MW grid-connected Solar Photovoltaic (PV) Power Projects by CPSUs/ State PSUs/ Government Organisations, with Viability Gap Funding (VGF) support over 4 years 2019-20 to 2022-23 for self-use or use by Government/ Government entities, either directly or through Distribution Companies (DISCOMS).
The VGF fund requirement over the four years 2019-20 to 2022-23 will be Rs.8580 crore, subject to a maximum of Rs.0.7 crore/MW, to be decided through bidding amongst Government organizations. The VGF content will be reviewed by MNRE, for downward revision if required. The savings thereby achieved is to be used for additional capacity.
Usage Charge: To be mutually agreed between Government organizations producing and consuming, subject to limit of Rs.3.50/unit.
Domestic Content Requirement (DCR): both Solar cells & modules to be domestically manufactured and MNRE can prescribe DCR for upstream components also such as domestically manufactured wafers/ ingots/ polysilicon or for higher efficiency cells.
Total Investment envisaged: Cost of the project: Rs.48,000 crore for 12,000 MW capacity, @ Rs.4 crore/MW.
Implementation Agency: Solar Energy Corporation of India Limited (SECI).
Role of SECI: SECI will handle the Scheme, on behalf of MNRE, by way of Bidding on VGF among prospective Government Producers; Scrutiny of project proposals for WTO compliance; Project progress monitoring including site inspection; Ensuring compliance of Domestic Content Requirement (DCR) by way of site inspection/ field visits; and handling of funds under the Scheme. For these activities, SECI will be given a fee of 1% of VGF disbursed.
The Scheme empowers MNRE to
increase the scope of DCR to include wafers, ingots & polysilicon or higher efficiency cells/modules;
empowers MNRE to reduce VGF if cost difference comes down
to make amendments or relaxation in provisions of the Scheme with no increase in fund requirement and VGF limit.