Recent tenders by SECI on grid-scale energy storage

Published by firstgreen on

India has set ambitious targets for renewable energy generation and is pushing towards meeting these goals. To achieve this, India is now looking at grid-scale energy storage systems. Recently, the Solar Energy Corporation of India (SECI) has invited tenders for a 20 MW (AC) solar PV power plant with 20 MW / 50 MWh battery energy storage system (BESS) at Phyang, Leh, UT of Ladakh, India. The project aims to reduce the dependency on conventional power generation sources and help Ladakh move towards a sustainable energy future.

Tender TitleLocationCapacityTender Submission Deadline
20 MW Solar PV Power Plant with 20 MW / 50 MWh BESSPhyang, Leh, UT of Ladakh, India20 MW (AC)7th April 2021
2 MW Solar PV Power Plant with 1 MWh BESSKaza, Himachal Pradesh, India2 MW (AC)30th March 2021
100 MW Solar PV Project with 50 MW / 150 MWh BESSRajnandgaon, Chhattisgarh, India100 MW (AC)TBA
160 MW Solar-Wind Hybrid Power Plant with BESSRamagiri, Andhra Pradesh, India160 MW (AC)TBA
2×1.5 MW Solar PV Power Plant with BESSLeh, India3 MW (AC)TBA

SECI’s recent tenders for grid-scale energy storage projects indicate India’s commitment towards renewable energy generation and its ambitious targets for reducing carbon emissions. The tender for a 20 MW (AC) solar PV power plant with 20 MW / 50 MWh BESS at Phyang, Leh, UT of Ladakh, India is a step towards a sustainable energy future. These projects are expected to create job opportunities, reduce the dependency on fossil fuels, and provide reliable power supply to remote areas.

Image source: https://www.seci.co.in/upload/news_images/Tender%20for%2020%20MW%20%28AC%29%20Solar%20PV%

Categories: Solar