SOLAR ROOFTOP PROJECT- 100 KW GRID CONNECTED

Published by firstgreen on

100 KW GRID CONNECTED SOLAR ROOFTOP PROJECT

Faculty Higher Secondary School is a private school in Amingaon, Guwahati-781039, AssamIndia part of Osom Educational Trust, which is a Non-profit Organization. The Area trustee of organization P.K. Bhuyan and B. Bhuyan.

Fig: Faculty Higher Secondary School, Amingaon, India Coordinates: 26.183300°N 91.702049°E

The school is located in North Guwahati, Assam, by the banks of Brahmaputra. It has an idyllic surrounding in 16 acres of greenery. Across the road of the School, the Indian Institute of Technology Guwahati with its sprawling complex is located, making the whole area an educational hub with of 100,000 sq. ft. of built-up indoor areas. The school is affiliated with Central Board of Secondary Education since 1989. It has classes from LKG to XII. It is a Day school with limited Hostel facilities for neighboring states like Arunachal Pradesh, Nagaland, Manipur, Meghalaya, Sikkim, and Mizoram. The hostel is air-conditioned.

We had approached the organization in October 2017, for the Grid connected Rooftop Solar power project with subsidy under RESCO mode. At that time we were empaneled with state Nodal Agency i.e.; Assam Energy Development Agency for the 14 MW grid connected RTSPV project with 70 % subsidy. In the RESCO mode the tariff were fixed @3.43/KWh for the 25 years. The organization don’t need to invest single penny for the project whole cost will be worn by Govt. in form of subsidy and the Developer.

We have made them understand about the viability of the project to offset the increasing bill amount of the Grid. After all discussion we have signed a PPA for the period of 25 years with complete O&M under our scope. There were two connection of Discom with Connected load of 70 kW and 72 kW respectively.

According to the APDCL Rooftop Solar guideline max. 80 % of connected Load can we Solarize. So, we went with 50 kW each on both connection.

Project Name 14 MW Grid Connected SRTPV PROJECT under RESCO mode.
Client FACULTY HIGHER SECONDARY SCHOOL , AMINGAON
EPC Contractor FIRSTGREEN CONSULTING PVT. LTD, Gurugram
Project Cost Rs. 55, 00,000.00 [70% subsidy and reaming 30 % recovered @ 3.43/ kWh of Solar energy being supplied.]

Material details of the Rooftop Solar Plant:

  Item Model/Make Specifications
1 Solar Panel  Poly Crystalline,  Sova Solar  (SP330V) 330 Wp, 304 nos.
2 Inverter  String Inverter , DELTA* ( M50U) 50 kVA, 2 nos.
3 MMS Aluminium structure (rail).  662 nos.
4 DC Cable Siechem DC cables 1c*4 mm.sq.
5 AC Cable Polycab  4 C* 25 sq.mm Cu wire
6 Lugs Copper /Bi metallic Ring type/Pin type
7 ACDBs Havells Indoor Type/ Wall Mounting
8 Earthing True power, Chemical earthing  3mtr, 6 nos.
9 Online monitoring Delremo 2 nos.

The plant installation & testing work completed in May 2018 after all approval from concerned authorities. After net metering done in November 2018 the plant is working properly and satisfactorily. Around 40-50 % of their unit charge is reduced from the APDCL bill.