Firstgreen · Solar advisory & engineering
Independent solar advisory—from feasibility to commissioning.
Make informed project decisions with technical and commercial support across site assessment, detailed engineering, procurement and delivery.
For developers, commercial and industrial consumers, and public-sector or institutional clients.

Established in 2010 · 500+ MW of solar project experience reported on our company page · India and international assignments. About Firstgreen →
Start with the decision you need to make
Developers & IPPs
Move from a candidate site to a coordinated design, procurement scope and delivery plan.
- Feasibility, DPR and yield.
- Engineering and tender support.
- Owner’s engineering and PMC.
Businesses & C&I consumers
Assess rooftop or other solar options against your site, electricity needs and implementation constraints.
- Site and demand assessment.
- Technical and commercial comparison.
- Procurement and delivery support.
Public & institutional clients
Structure technical studies, procurement documents and implementation reviews around programme objectives.
- Project preparation and DPR.
- Tender and specification support.
- Delivery and documentation review.
Support across the solar project lifecycle
Select one work package or agree an integrated assignment. Deliverables, responsibilities and programme are defined for your project.
01 · Feasibility
Establish the project basis
Review land or roof constraints, solar resource, access, evacuation options and information gaps.
02 · DPR & yield
Test technical and commercial options
Develop the design basis, generation estimates, loss assumptions and financial scenarios.
03 · Engineering
Coordinate the detailed design
Bring layouts, electrical systems, civil and structural interfaces, equipment schedules and specifications together.
04 · Procurement
Define and evaluate the scope
Prepare technical tender requirements, assess EPC proposals and clarify exclusions, interfaces and guarantees.
05 · OE & PMC
Oversee quality and delivery
Review designs and vendors, monitor construction, inspect installation quality and support commissioning reviews.
06 · Performance
Investigate operating performance
Assess available plant data, review losses and identify prioritised actions for further investigation or improvement.
Specific outputs your team can use
The final deliverable register depends on the agreed assignment. Typical work packages include:
| Work package | Example deliverables | Decision supported |
|---|---|---|
| Feasibility & DPR | Site constraints review, design basis, DPR and option assessment | Whether and how to advance the project |
| Energy yield | Generation estimates, loss assumptions and sensitivity scenarios | Energy and investment assumptions |
| Detailed engineering | Plant layouts, SLDs, cable schedules, earthing plans, equipment specifications and civil/structural interfaces | Design coordination and procurement |
| EPC procurement | Technical tender schedules, bid comparison and clarification register | Contractor and equipment selection |
| Owner’s engineering & PMC | Design comments, inspection reports, progress reviews and commissioning punch lists | Quality, execution and handover |
| Performance review | Plant-data assessment, diagnostic findings and prioritised recommendations | Operational investigation and improvement |
Studies and drawings are issued at the agreed level of maturity and review status. Yield estimates, approvals and project outcomes depend on the inputs and applicable scope.
Experience with a clearly defined role
Explore published assignments across bid advisory, engineering, project oversight and rooftop delivery.

Today Energy · Pokhran
Financial modelling and bid support for a 60 MW award, followed by detailed engineering for the 50 MW Pokhran plant. The bid award and plant design are distinct parts of the engagement.

Arhyama Solar · 6 MW
PMC and owner’s engineering in Andhra Pradesh, including structural and electrical design review, vendor assessment and construction inspections through commissioning.
Rooftop delivery
ISA · Seychelles
Rooftop solar delivery and completion reporting. The 1 October 2026 report recorded completed site work, with utility metering and grid-connection approvals still pending at that date.
A dated project milestone; not a statement that the plant is currently grid commissioned.
Also explore GRT’s 412 MWp portfolio advisory and regulatory documentation assignment →
Engineering supported by TwinPro
Use a shared visual context to discuss terrain, candidate layouts, equipment identities and electrical relationships. TwinPro complements the engineering workflow by making the project easier to navigate and review.
- Discuss site geometry and preliminary table arrangements.
- Review reusable assets and electrical connectivity.
- Connect design information to asset records and later project stages.
The view is a preliminary design example. Engineering calculations, drawings and construction issues require the relevant project review.

A practical engagement, with clear review gates
1. Define
Confirm the decision, site, project stage, available inputs and information gaps.
2. Analyse
Review the evidence and compare the relevant engineering and commercial options.
3. Review
Resolve comments, document assumptions and agree the deliverables for issue.
4. Support
Provide the agreed procurement, construction or operational follow-through.
Discuss your solar project
Share the essentials below so we can identify the right technical team and scope. A complete data pack is not needed for an initial discussion.
Project details
- Organisation, name and contact details.
- Site location and project type.
- Proposed capacity in MW or kWp.
- Current stage: feasibility, design, procurement, construction or operation.
Support required
- Required service or deliverables.
- Target date and current constraints.
- Available layouts, equipment data or energy records.
- The decision you need to resolve.
Enquiries go to Firstgreen’s team at info@firstgreen.co. Scope, fees and delivery programme are confirmed after the initial review.