State-wise Cumulative Capacity installed under Off-grid SPV Programme
Source : MNRE Annual report
Source : MNRE Annual report
Source: MNRE Annual report
Source: MNRE Annual report
INTENT The intent of this criterion is to ensure safe, healthy, and hygienic working and living conditions for construction workers involved in the project. Maximum Points: 1 APPRAISAL Provide for drinking , sanitation and living and creche facilities for construction workers as per NBC 2016 norms. Provide either a grocery Read more…
INTENT The intent of this criterion is to promote a better working environment for service staff by providing dedicated rooms (for resting) and toilets for them. Maximum Points: 2 APPRAISAL Ensure dedicated rooms and washrooms for staff. COMPLIANCE Submit drawings highlighting rooms and washrooms for staff. Submit date-stamped photos of Read more…
INTENT The intent of this criterion is to ensure that all electro-mechanical systems and their components are designed and installed according to the operational requirements of the owner. Maximum Points: 0 APPRAISAL Ensure that third party-commissioning is conducted for systems like hvac, lighting and electrical, water and waste. Ensure that Read more…
INTENT The intent of this criterion is to promote smart metering and monitoring of energy and water consumption of the project to analyse its performance. Maximum Points: 6 APPRAISAL Ensure placement of smart meters for projects energy consumption. Ensure placement of meters for projects water consumption. Ensure sharing of energy Read more…
INTENT The intent of this criterion is to encourage use of alternative materials, which minimize the detrimental impact of construction on environment by conserving natural resources, further minimizing the use of virgin materials and diverting usable (as per industry standards) wastes from the landfills to the construction industry. Maximum Points: Read more…
INTENT The intent of this criterion is to reduce the impact of material selection on the environment and encourage the project to optimize construction product consumption efficiency by selecting low GWP (kgCO2eq)products through LCA of the building. Maximum Points: 5 APPRAISAL Demonstrate the kgC02 equivalent reduction in building super-structure and Read more…