State-wise Solar Rooftop Systems Capacity Commissioned as on 31.12.2019
Source MNRE Annual report
Source MNRE Annual report
Earlier, Ministry has been implementing Grid Connected Rooftop and Small Solar Power Plants Programme which is providing subsidy upto 30% of benchmark cost for the general category states and upto 70 % of benchmark cost for special category states, i.e. Read more
Phase II of the Grid connected rooftop solar programme was approved for with a target for achieving a cumulative capacity of 40,000 MW from Rooftop Solar (RTS) Projects by the year 2022 in February 2019. The programme will be implemented Read more
Intent To support energy management and identify opportunities for additional energy savings by tracking building-level and system-level energy use. Possible Credit Points- 1 point This credit applies to New Construction (1 point) Core & Shell (1 point) Schools (1 point) Read more
After successful demonstration of MW projects in Demo Scheme, Ministry launched a Generation Based Incentives (GBI) programme on 16th June 2010 to give a thrust to rooftop PV and other small solar power plants connected to grid under Phase I Read more
DEMO SOLAR GBI MNRE had announced the Demonstration Programme on Grid Interactive Solar PV Power Generation (Demo Solar GBI) in the FY 2008-09 before the starting of JNNSM. Salient features are as under: Scheme was formulated for 25 MW for Read more
Scheme for Setting up of over 5000 MW Grid Connected Solar PV Projects with VGF under NSM Phase– II, batch-IV The Scheme was launched in 2015-16, to be implemented in 4 years (at least 1250 MW in each year). Initial Read more
Scheme for Setting up of over 2000 MW Grid connected solar PV Projects with VGF under NSM Phase- II, Batch-III. Guidelines issued on dated 04th August 2015. Power purchased by SECI @ Rs.4.43/kWh (PPA) and sold to buying utilities @ Read more
The scheme provides for the setting up of large scale ground-mounted solar PV projects on pan-India basis for 750 MW capacity. After a transparent selection and award process, projects of capacity 680 MW could successfully achieve financial closure and were Read more