Solar layout quantity and BOQ reconciliation

Firstgreen compares quantities measured from a preliminary solar layout with the bill of quantities used for budgeting. The review gives procurement and engineering teams a common explanation for differences before they revise a cost estimate.

Establishing a common basis

We align package boundaries, equipment ratings, table types and units. We compare net quantities first, then show allowances separately. A trench metre, a cable metre and a metre of single-core conductor represent different purchases.

Following the variance

The reconciliation separates counted assets from routed lengths and estimated wiring. An exception register links material differences to their likely cause, the drawing or model revision, and the engineering decision needed to close them.