Digital solutions are key to grid stability

Renewable Watch recently interacted with Pitamber Shivnani, President, Power Grids, ABB India, regarding the role of digitalisation in the renewable sector, on the sidelines of GRIDTECH 2019. Excerpts from the conversation. What are the key transmission constraints in the renewable energy space in India? Well, geography for one. The sheer Read more

By firstgreen, ago

“India needs an additional 66.5 GW of ISTS network for renewable energy zones”

Transmission-related issues have considerably slowed down renewable energy development in the country, and the problems are only likely to get aggravated with the increase in the quantum of renewables available for grid injection. To address transmission constraints, a comprehensive plan covering transmission and control infrastructure was identified as part of Read more

By firstgreen, ago