GRIHA VERSION 2019 CRITERIA 27. COMMISSIONING FOR FINAL RATING
INTENT
The intent of this criterion is to ensure that all electro-mechanical systems and their components are designed and installed according to the operational requirements of the owner.
Maximum Points: 0
APPRAISAL
- Ensure that third party-commissioning is conducted for systems like hvac, lighting and electrical, water and waste.
- Ensure that a commissioning plan is in place.
COMPLIANCE
- Submit a commissioning plan highlighting details of commissioning team, scope and processes.
- Submit project specific commissioning schedule.