GRIHA VERSION 2019 CRITERIA 27. COMMISSIONING FOR FINAL RATING

Published by firstgreen on

INTENT

The intent of this criterion is to ensure that all electro-mechanical systems and their components are designed and installed according to the operational requirements of the owner.

Maximum Points: 0

APPRAISAL

  • Ensure that third party-commissioning is conducted for systems like hvac, lighting and electrical, water and waste.
  • Ensure that a commissioning plan is in place.

COMPLIANCE

  • Submit a commissioning plan highlighting details of commissioning team, scope and processes.
  • Submit project specific commissioning schedule.