GRIHA VERSION 2019 CRITERIA 29. OPERATION AND MAINTENANCE PROTOCOL
![](https://i0.wp.com/dcsgroups.in/temp/wp-content/uploads/2020/04/om.png?w=750)
INTENT
The intent of this criterion is to ensure incorporation of detailed O&M procedures for various systems in the building and a compulsory requirement for the staff to undergo the necessary training
Maximum Points: 0
APPRAISAL
- Ensure there is a group responsible for O&M of the building systems.
- Ensure development of O&M manual.
COMPLIANCE
- Submit contract document highlighting a dedicated party for O&M.
- Submit O&M manual.