Commissioning Status of Grid Connected Solar Projects as on 31-12-2019
Source: MNRE Annual report
Source: MNRE Annual report
INTENT The intent of this criterion is to promote smart metering and monitoring of energy and water consumption of the project to analyse its performance. Maximum Points: 6 APPRAISAL Ensure placement of smart meters for projects energy consumption. Ensure placement Read more
INTENT The intent of this criterion is to ensure that all electro-mechanical systems and their components are designed and installed according to the operational requirements of the owner. Maximum Points: 0 APPRAISAL Ensure that third party-commissioning is conducted for systems Read more
INTENT The intent of this criterion is to promote a better working environment for service staff by providing dedicated rooms (for resting) and toilets for them. Maximum Points: 2 APPRAISAL Ensure dedicated rooms and washrooms for staff. COMPLIANCE Submit drawings Read more
INTENT The intent of this criterion is to ensure safe, healthy, and hygienic working and living conditions for construction workers involved in the project. Maximum Points: 1 APPRAISAL Provide for drinking , sanitation and living and creche facilities for construction Read more
INTENT The intent of this criterion is to substitute conventional materials used for external site development with alternative materials, in order to reduce pressure on both mining for virgin materials and landfills requiredfor the disposal of waste material. Maximum Points: Read more
INTENT The intent of this criterion is to reduce the impact of material selection on the environment and encourage the project to optimize construction product consumption efficiency by selecting low GWP (kgCO2eq)products through LCA of the building. Maximum Points: 5 Read more
INTENT The intent of this criterion is to encourage use of alternative materials, which minimize the detrimental impact of construction on environment by conserving natural resources, further minimizing the use of virgin materials and diverting usable (as per industry standards) Read more
INTENT The intent of this criterion is to divert organic waste from landfill sites by adopting strategies for treating it on site and thereby mitigating its adverse effects on the surrounding environment. Maximum Points: 2 APPRAISAL Ensure that the organic Read more
INTENT The intent of this criterion is to provide the necessary infrastructure to future occupants of the project so that they can sustainably manage on-site solid waste during the operation phase and comply with the statutory norms for disposal in Read more
Firstgreen Renewable Energy Updates