Project Installed Capacity as of 2021-2022

Published by firstgreen on

The projected installed capacity by the end of 2021-22 as per midterm NEP review is 4,76,431 MW (44,989 MW Hydro, 5246 MW PSP; 2,15,773 MW

Coal; 25,343 MW Gas; 10,080 MW Nuclear, 5,000 MW small Hydro, 10000 MW Biomass, 100,000 MW solar and 60,000 MW wind) and has been considered as the base capacity (Table 1). Additionally, hydro imports totaling to 2136 MW have been considered till 2021-22. The base year of  the study has been considered as 2021-22.

Table 1

 

Technology                                  Capacity(MW)

Hydro*

44,989

Pumped Storage

5246

Coal

2,15,773

Gas

25,343

Nuclear

10,080

Solar

1,00,000

Wind

60,000

Biomass

10,000

Small Hydro

5,000

Total IC by 2021-22

4,76,431

Categories: Uncategorized