Arhyama Solar Power engaged Firstgreen as the Project Management Consultant (PMC) for its 6 MW solar plant in Andhra Pradesh, with a clear mandate—ensure absolute quality at every stage of development. Acting as the owner’s engineer, Firstgreen delivered comprehensive oversight to guarantee that every system, component, and construction activity met rigorous technical and performance standards.

The engagement began with detailed design validation, ensuring that engineering drawings, structural layouts, and electrical configurations aligned with best practices and site conditions. This was followed by thorough vendor capability assessments to confirm that all suppliers and contractors met the project’s quality benchmarks.

A major focus of the PMC role was continuous on-site supervision. Firstgreen implemented strict quality protocols during module mounting, structural erection, electrical installation, and commissioning. Through meticulous inspections, process audits, and adherence to safety and technical guidelines, the team ensured seamless execution without compromise.

By enforcing high-precision construction practices and verifying each stage of the project, Firstgreen ensured that the plant achieved optimal performance from day one. The result was a solar installation built on reliability, consistency, and long-term operational efficiency—setting a quality benchmark for similar mid-scale solar projects.