Q: Does my building envelope comply prescriptively with the ECBC?

Prescriptive Requirements for Fenestration Location                       :  Gurugram Climate Zone               :  Composite (Lat: 28° 42’ N; Long: 77° 54’ E) Building Type               : Daytime Use Building Roof Area                     : 409 m2 Roof Insulation            : Rigid Board 25 mm with R = 2.1 m2·K/W Wall Area                      : 930 m2 Wall Insulation             :  Read more…

What are the most important factors that a building professional should consider for regarding windows, doors, and skylights for ECBC compliance?

The SHGC and U-factor ratings are the most important items to verify during inspections. Building professionals should verify that the ratings of the installed windows, doors, and skylights meet or exceed the ratings specified on the plans. It is also important to verify that the same window area has been Read more…

List of Tier-1 Solar Panel

Tier 1 manufacturers are the companies in the quarterly Bloomberg New Energy Finance (BNEF) and is a flat term used by sales companies and manufacturers. “Tier 1 module manufacturers are those which have provided own-brand, own-manufacture products to six different projects, which have been financed non-recourse by six several (non-development) Read more…