Planning an On Grid system

In the case of PV On-Grid systems, the system sizing depends on profitability, the energy price or feed-in tariff, available mounting area and approved or connectable PV power. Factors affecting design The most important requirement is the roof orientation Optimal inclination angle between 30 – 45° Transmission possibility of a Read more

By firstgreen, ago

Planning an Off Grid system

Given the basic requirements, while planning any type of Solar PV System, the off-grid system differs in design in regard to certain additional components.   Dry and ventilated storage place for batteries, if possible protect against low temp (optimal around 20°C) Thermal systems Additional roof statics approx 50kg for 1 installed collector (40kg collector, Read more

By firstgreen, ago

On Grid System Maintenance

Having a solar PV system requires one to conduct an annual inspection of the system, usually before summer. But in general, there are no costs incurred for wear and tear of materials, except the PV inverter with expected 10-15 years operating time. Damages to the components are generally low. In Read more

By firstgreen, ago